surface preparation

Plastered Walls: Moisture penetration of walls and causing cancer or efflorescence

For optimal results on a Plastered Walls surface in a Moisture penetration of walls and causing cancer or efflorescence state, please follow the instructions below for preparation and application. Links to the products utilised in this guide are listed below.

Preparation

1. Remove excess thoroughly by scraping or wire brush
2. Apply SelfCoat Prep and work into surfaces
3. Leave 30 min then rinse of with clean water
4. If necessary repeat

Application

1. Apply 1 coat Bind
2. Apply 2 coats of colour


Products used